House in Gordon’s Bay

The work we needed to do

  • Convert the garage in a Fourth room with an-ensuite
  • Built a living area and indoor braai
  • Renovate the kitchen and insert a scullery
  • Renovate the stairs
  • Renovate the main bedroom
  • Paint all the interior walls
  • Take out all the carpets and replace with laminating flooring
  • Paint the exterior walls
  • Built a deck
  • Built a storage space underneath the deck
  • Built a swimming pool
  • Built stairs for the deck and swimming pool
  • Built an outside braai
  • Built a single garage
  • Built a small wall at the front
  • Paint exterior walls

Before

Completed